In Red Bluff, Calif., a Walmart distribution center will soon be distributing more than just products. Today, Forbes reported that a 265-foot-high wind turbine is being completed on the site. According to the story, the 1-megawatt General Electric turbine will supply between 15 and 20 percent of the center’s electricity and is the next step in our ultimate goal to be powered 100 percent by renewable energy.
Check out the full story here.



